12/I69C Interchange Project
Connectors include two (2) 12 foot wide travel lanes with 4 foot wide sides and 10 foot wide outside shoulders, plus on and off ramps and the auxiliary lanes between ramps.
Connectors include two (2) 12 foot wide travel lanes with 4 foot wide sides and 10 foot wide outside shoulders, plus on and off ramps and the auxiliary lanes between ramps.
The complete construction of a two level 280,000 sf terminal build-out; inclusive of ticket counter, six security lanes, five arrival and departure gates, demolition of existing Badge and Administrative facilities, relocation of HAS offices and Shops to an existing HAS facility, relocation of communications facility, relocation of the existing Southwest Airlines ticket counter and relocation of existing security check point. Also included the need for an underground tunnel for mechanical piping, electrical and the new baggage system.
The construction of the 265,000 sf New Terminal C at IAH, including floor-to-ceiling windows, passenger lounge areas and 20 new restaurant and retail concessions.
IAH Terminal Redevelopment Program (ITRP) includes several major projects and several enabling projects to serve the newly constructed facilities.